Mott MacDonald provided a reference design for The Discount Glashutte, prescribing minimum i.d tunnel, and two 3.7m minimum i.d 12m deep shafts, with the contract being let as an Discount Graham. The short length of the tunnel, the limited headroom at the shafts that would be excavated within basements, and the fact that the planned alignment was curved all lent to sprayed concrete lining Discount Hamilton rather than segmental construction. Part of the works would be completed within the basement of the 45 Park Lane building during the substantial main contract refurbishment works. Discount Hublot the main worksite would be located in the fully-operational hotel basement. In an effort to mitigate these interface risks, and to use the existing relationship that had been formed through the main contract works, project managers Buro 4, the employer's representative Mott MacDonald and The Dorchester Collection agreed to appoint Kier Wallis as the principal contractor.